Diashowa Ship Loading

Diashowa Ship Loading

Industrial engineering/wood products
Diashowa ship loading

Port Angeles, Washington

SUMMARY

Crow Engineering provided the project engineering and conveyor system design on chip plant modifications and a new ship loading facility installation. The goal was to increase the chip-loading rate from 400 TPH to 1200 TPH without causing any additional chip discharge to the waterway.

The capacity of the existing reclaim conveyor was increased by threefold. A new 60″ wide conveyor (86 feet tall and 430 feet long) was installed to convert the system from a “long-blow” system to a “short-blow” system. A new tower with a ship-loading boom was installed on a new marine foundation.

During Phase 2, Crow Engineering was hired to design a state-of-the-art barge unloading system including the “Slave Barge,” onboard chip reclaim conveyor and transition conveyor, new articulating conveyor to dock, 250 feet long dock-supported chip conveyor, and rotary stacker for pile creation.

Additional Industrial/Wood products projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Reach out to Crow Engineering


Skip to content